Jurnal Teknik Sipil https://ojs.uajy.ac.id/index.php/jts <p>Jurnal Teknik Sipil (JTS) is a scientific journal in the scope of Information Systems. JTS is published by the Department of Civil Engineering of Universitas Atma Jaya Yogyakarta. First published in October 2000. JTS now publishes 2 series within a year, in <strong>April</strong> and <strong>October</strong>. </p> Program Studi Teknik Sipil Fakultas Teknik Universitas Atma Jaya Yogyakarta en-US Jurnal Teknik Sipil 1411-660X COVER https://ojs.uajy.ac.id/index.php/jts/article/view/10949 <p> </p> <p> </p> Jurnal Teknik Sipil Copyright (c) 2024 Jurnal Teknik Sipil https://creativecommons.org/licenses/by-nc-sa/4.0 2024-10-31 2024-10-31 18 1 FRONT MATTER https://ojs.uajy.ac.id/index.php/jts/article/view/10948 <p> </p> <p> </p> Jurnal Teknik Sipil Copyright (c) 2024 Jurnal Teknik Sipil https://creativecommons.org/licenses/by-nc-sa/4.0 2024-10-31 2024-10-31 18 1 IMPLEMENTASI 3D PRINTING BETON DAN BAJA PADA DESAIN FABRIKASI DI SEKTOR KONSTRUKSI https://ojs.uajy.ac.id/index.php/jts/article/view/8424 <p><em>The increasing need for development makes humans continue to find more efficient and faster ways. Therefore, technology is also growing rapidly and forcing all sectors to be able to keep up to date so as not to be left behind. The use of 3D Printing is one of the technologies that are beginning to be applied. This 3D Printing technology shows a significant change from conventional construction. The method used in this article is literature review, by collecting previous research literature. This study aims to determine the implementation of 3D Printing on fabrication design in construction. Data obtained from several journals discuss the implementation, advantages, and limitations of 3D Printing in technology, cost and time. Therefore, it is expected to open the views of construction stakeholders to be able to see the potential use of 3D Printing in the construction field.</em></p> Nisrina Fahriah Dea Prilita Oei Fuk Jin Copyright (c) 2024 Jurnal Teknik Sipil https://creativecommons.org/licenses/by-nc-sa/4.0 2024-10-31 2024-10-31 18 1 1 7 10.24002/jts.v18i1.8424 PENGARUH RANGKAIAN GEMPA UTAMA – GEMPA SUSULAN TERHADAP REDUNDANSI DAN KERUNTUHAN PROGRESIF STRUKTUR RANGKA PEMIKUL MOMEN BETON BERTULANG https://ojs.uajy.ac.id/index.php/jts/article/view/9601 <p>Rangkaian kejadian gempa meningkatkan kerusakan kumulatif pada struktur karena meningkatnya simpangan antar lantai, terutama untuk daerah potensi gempa kuat atau bangunan penting. Redundansi bergantung pada karakteristik dinamis dan geometris strukturnya serta sifat eksitasi gempa, peningkatan redundansi tidak dapat didefinisikan sebagai kriteria untuk meningkatkan perilaku seismik struktur, namun sangat berkaitan erat dengan keruntuhan progresif. Penelitian ini melihat pengaruh rangkaian gempa MSEq –ASEq terhadap redundansi dan keruntuhan progresif dari 16 model struktur rangka pemikul momen beton bertulang dengan variasi jumlah bentangan dan jumlah lantai tapi dengan luas denah yang sama, dengan melihat nilai simpangan antar lantai dan rotasi balok serta rasio gaya aksial terhadap kapasitas aksial kolom pada beberapa skenario pelepasan kolom. Rangkaian gempa MSEq-ASEq berpengaruh sangat signifikan terhadap kebutuhan redundansi struktur terlihat dari peningkatan nilai simpangan antar lantai namun tidak untuk keruntuhan progresif dimana tidak terjadi peningkatan nilai rotasi balok dan gaya aksial kolom (rasio ≈ 1). Menambah jumlah bentangan pada denah tidak selalu mengurangi besaran simpangan antar lantai, namum efektif untuk mengurangi nilai rotasi balok dan rasio gaya aksial terhadap kapasitas aksial kolom</p> Hendry David Zacharias Junaedi Utomo Yoyong Arfiadi Ade Lisantono Copyright (c) 2024 Jurnal Teknik Sipil https://creativecommons.org/licenses/by-nc-sa/4.0 2024-10-31 2024-10-31 18 1 8 20 10.24002/jts.v18i1.9601 PENEMPATAN SENSOR AKSELEROMETER PADA JEMBATAN MERAH PUTIH https://ojs.uajy.ac.id/index.php/jts/article/view/10354 <p>Kegiatan <em>monitoring</em> pada jembatan perlu dilakukan sebagai upaya dalam menjamin keamanan jembatan. Secara umum terdapat dua metode <em>monitoring</em> kesehatan struktur jembatan yaitu dengan melakukan <em>Loading Test</em> secara langsung dan melalui <em>Structural Health Monitoring System</em> (SHMS) yang dapat dipantau secara <em>real time</em> dan kontinu. Salah satu sensor yang penting dan populer dalam kegiatan SHMS adalah akselerometer. Data dari sensor tersebut dapat diproses lebih lanjut untuk mengetahui nilai frekuensi struktur, <em>mode shape</em>, dan <em>displacement</em> yang terjadi. Hal tersebut bermanfaat dalam pemantauan kesehatan struktur jembatan secara keseluruhan dan dapat dijadikan dasar penetapan kebijakan untuk pemeliharaan jembatan, serta penyusunan tindakan preventif dan kuratif. Penempatan sensor yang baik dengan jumlah sensor yang tepat harus ditentukan untuk mengetahui perilaku struktur yang sebenarnya dengan biaya yang minimal. Penelitian ini bertujuan untuk mengevaluasi penempatan sensor akselerometer pada dek Jembatan Merah-Putih yang memiliki tipe <em>double pylon cable stayed</em> dengan bentang 300 m yang terletak di Kota Ambon, Provinsi Maluku, Indonesia. Empat metode <em>Optimal Sensor Placement</em> (OSP) telah dilakukan yaitu dengan <em>Effective Independence</em> (EI) <em>Method</em>,&nbsp;&nbsp; <em>Eigenvalue Component Product</em> (ECP), <em>Mode Shape Summation Plot</em> (MSSP) <em>Method</em>, serta <em>Effective Independence – Drive Point</em> <em>Residu</em> (EI-DPR) <em>Method</em>. Dari keempat metode tersebut, didapatkan bahwa penempatan sensor yang paling optimal didapatkan dari metode EI dengan jumlah sensor yang optimal adalah berjumlah 10. Konfigurasi sensor tersebut memiliki performa yang sedikit lebih baik dari konfigurasi sensor eksisting.</p> Johan Lautan Wijaya Nusantara Akhmad Aminullah Suprapto Siswosukarto Copyright (c) 2024 Jurnal Teknik Sipil https://creativecommons.org/licenses/by-nc-sa/4.0 2024-10-31 2024-10-31 18 1 21 30 10.24002/jts.v18i1.10354 OPTIMASI PINTU AIR DAERAH IRIGASI (D.I) PUNGGUR UTARA ZONA C PETAK 16 KIRI 1 KABUPATEN LAMPUNG TIMUR DAN LAMPUNG TENGAH https://ojs.uajy.ac.id/index.php/jts/article/view/9993 <p>Daerah Irigasi Punggur Utara, bagian dari Sistem Sekampung, mencakup 132,28 hektar di Kabupaten Lampung Tengah, Lampung Timur, dan Kota Metro. Tantangan utamanya adalah distribusi air yang tidak efisien, menyebabkan pemborosan dan persaingan atas sumber daya air yang terbatas. Untuk mengatasi masalah ini, pintu air dioptimalkan dengan menyesuaikan hubungan antara ketinggian pintu dan kebutuhan air. Daerah ini mengikuti pola tanam Padi-Padi-Bera, dengan data curah hujan dari tahun 2014-2023 menunjukkan puncak 5,13 mm/hari pada bulan Maret. Kebutuhan air berkisar dari 0,04 m³/detik di bulan April hingga 0,20 m³/detik di bulan Mei. Pintu air Crump de Gruyter, dengan lebar 0,75 meter dan koefisien 0,913, mengatur aliran air. Bukaan pintu 5 cm menyediakan 0,20 m³/detik untuk memenuhi kebutuhan tertinggi, sedangkan bukaan 1 cm menghasilkan 0,04 m³/detik untuk kebutuhan terendah. Optimalisasi dilakukan menggunakan Pemrograman Linear melalui Solver, menyesuaikan ketinggian pintu untuk memenuhi kebutuhan irigasi dalam batas kapasitas. Metode ini meningkatkan manajemen sumber daya air di Punggur Utara.</p> M Gilang Indra Mardika Indri Rahmandhani Fitriana Vaisyah Rahmawati Copyright (c) 2024 Jurnal Teknik Sipil https://creativecommons.org/licenses/by-nc-sa/4.0 2024-10-31 2024-10-31 18 1 31 38 10.24002/jts.v18i1.9993 EVALUASI SEISMIK GEDUNG PERKULIAHAN 3 DAN 6 LANTAI EKSISTING DI KOTA YOGYAKARTA https://ojs.uajy.ac.id/index.php/jts/article/view/10168 <p>The three-story reinforced concrete building as a college building was built in the city of Yogyakarta in 2011. The building was originally designed to have 6 floors using SNI 1726-2002 and SNI 2847-2002. With the development of construction standards in Indonesia, both regulations have been updated to SNI 1726-2019 and SNI 2847-2019. As a consequence of the updated regulations, re-evaluation of building structures against earthquake loads is important to do. This study aims to evaluate the performance of the existing building structure. The buildings are analyzed under two scenarios: the existing three-story condition and the planned six-story construction according to the Detailed Engineering Design (DED). The analysis employs a nonlinear static procedure based on ASCE 41-23 standards, with seismic load distribution derived from the Indonesian Earthquake Hazard Deaggregation Map. The seismic loading considers two levels of seismic hazard: BSE-1E and BSE-2E. Results indicate that both the three-story and six-story buildings fail to meet the performance criteria stipulated in ASCE 41-23. The evaluation results show that neither the three-story nor the six-story building achieves the Immediate Occupancy (IO) performance level under design earthquake BSE-1E, nor do they meet the Life Safety (LS) performance level under earthquake BSE-2E. Additionally, neither structure meets the maximum allowable horizontal displacement requirements.</p> Inggar Septhia Irawati Isnaini Heriawati Angga Fajar Setiawan Copyright (c) 2024 Jurnal Teknik Sipil https://creativecommons.org/licenses/by-nc-sa/4.0 2024-10-31 2024-10-31 18 1 39 50 10.24002/jts.v18i1.10168 MANAJEMEN BISNIS KONSTRUKSI DENGAN BUILDING INFORMATION MODELLING PADA LIFE CYCLE COST: KAJIAN BIBLIOMETRIK https://ojs.uajy.ac.id/index.php/jts/article/view/10217 <p>Penelitian ini mengkaji integrasi <em>Building Information Modeling</em> (BIM) <em>dalam Life Cycle Cost</em> (LCC) pada proyek konstruksi, menggunakan analisis bibliometrik untuk memetakan tren publikasi antara 2015 hingga 2024. Dari 103 dokumen yang dianalisis menggunakan perangkat lunak VOSviewer, tren menunjukkan peningkatan signifikan setelah 2019, dengan jumlah publikasi tertinggi pada 2019 dan 2021, masing-masing 17 artikel (16,67%). Analisis ini melibatkan 291 penulis, dengan Jrade Ahmad menjadi penulis paling produktif (4 dokumen, 66 kutipan). Dalam analisis <em>co-citation</em>, jurnal <em>Sustainability</em> tercatat sebagai sumber paling banyak dikutip (107 kutipan). Secara teknis, studi ini memanfaatkan VOSviewer untuk menganalisis jaringan kolaborasi, dengan 27 penulis memenuhi kriteria minimal dua dokumen. Jaringan kata kunci menyoroti “BIM” dengan frekuensi 293 kemunculan, terhubung erat dengan “<em>life cycle cost</em>” dan “<em>life cycle assessment</em>”. Hasil juga menunjukkan kontribusi signifikan dari negara seperti Amerika Serikat, Tiongkok, dan Australia, masing-masing menghasilkan 10 publikasi. BIM memungkinkan otomatisasi perhitungan LCC, mengurangi kesalahan manual, dan meningkatkan efisiensi estimasi melalui integrasi perangkat seperti Revit dengan Dynamo atau Excel. Perhitungan biaya siklus hidup meliputi desain, konstruksi, hingga operasi dan pemeliharaan. Alat seperti <em>Green Building Studio</em> (GBS) dan <em>One Click</em> LCA membantu mengintegrasikan LCA untuk menganalisis dampak lingkungan dan efisiensi biaya. Penelitian ini menekankan pentingnya pengembangan perpustakaan BIM yang seragam dan peningkatan kolaborasi global untuk mengatasi tantangan seperti biaya tinggi dan kurangnya tenaga ahli terlatih.</p> Yulius Chaesario Kurniawan Nectaria Putri Pramesti Copyright (c) 2024 Jurnal Teknik Sipil https://creativecommons.org/licenses/by-nc-sa/4.0 2024-10-31 2024-10-31 18 1 51 62 10.24002/jts.v18i1.10217 PERBAIKAN TANAH MENGGUNAKAN METODE PRELOADING KOMBINASI PVD PROYEK AKATARA GAS PLANT FACILITY https://ojs.uajy.ac.id/index.php/jts/article/view/8726 <p>Soft soil is a serious problem in the implementation of the Akatara Gas Plant Facility Project because soft soil has a low bearing capacity and experiences large settlements. Effective soil improvement to solve this problem is PVD combination preloading methods. This research aims to plan soil improvement for the primary road construction of the Akatara Gas Plant Facility project in Jambi using PVD combination preloading method. The planned PVD is non-woven PVD with variations in size: 9.5 cm wide, 3.5 cm thick, 10 cm wide, 0.4 cm thick, and 10.5 cm wide, 4.5 cm thick. Calculation of consolidation time after PVD was carried out using triangle and square patterns with varying distances of 100 cm, 110 cm, 130 cm and 150 cm. Based on the analysis results, soil preloading could not be applied because it collapsed, so soil preloading was combined with vacuum preloading. The vacuum preloading used has a capacity of 80 kPa and the required embankment is 3.93 meters high. The planned PVD depth is 12 meters deep. 90% consolidation time required at a distance of 100 cm triangle pattern, 100 cm square pattern, 110 cm triangle pattern, 110 cm square pattern, 130 cm triangle pattern, 130 cm square pattern, 150 cm triangle pattern and 150 cm square pattern cages are 13 weeks, 15 weeks, 9 weeks, 10.5 weeks, 13 weeks, 15.5 weeks, 18 weeks, and 21 weeks. The most effective PVD installation distance and pattern is a distance of 110 cm with a square pattern. The choice of distance and installation pattern is adjusted to the work time for soil improvements on the Akatara Gas Plant Facility Project.</p> Luthfi Amri Wicaksono Tasya Afkarina Paksitya Purnama Putra Copyright (c) 2024 Jurnal Teknik Sipil https://creativecommons.org/licenses/by-nc-sa/4.0 2024-10-31 2024-10-31 18 1 63 71 10.24002/jts.v18i1.8726 BRIDGE FOUNDATION DESIGN INTEGRATING GROUND IMPROVEMENT TECHNIQUES IN CHALLENGING SOIL https://ojs.uajy.ac.id/index.php/jts/article/view/10313 <p>This study investigates the optimal design of bridge foundations incorporating ground improvement techniques in challenging soil conditions, employing a case study methodology. Bridge foundations primarily serve to transfer forces applied by the bridge to the underlying soil, and ground improvement techniques enhance soil properties, particularly in complex environments. Challenging soil conditions pose substantial difficulties in designing and constructing bridge foundations, requiring engineers to employ specific methodologies to ensure stability and long-term resilience. These solutions are crucial in areas with weak or unstable soil incapable of supporting large structures like bridges. This study aims to conduct a thorough comparative analysis to evaluate the suitability of Controlled Modulus Columns (CMC) for a roadway project in north-central Java, where soil conditions present significant challenges. By collecting and analyzing secondary data from various sources, including literature, case studies, and empirical research, the study assesses ground improvement techniques' effectiveness, efficiency, and performance in similar soil and geotechnical conditions. The objective is to determine whether CMCs are the most beneficial approach for enhancing the stability and performance of the highway or if alternative methods, which require rapid installation and high load-bearing capacity while minimizing soil disruption, might be more appropriate. The study highlights that Deep Soil Mixing (DSM) offers advantages comparable to CMCs and has proven effective in different soil conditions. This research aims to provide valuable insights into selecting optimal ground improvement techniques for bridge foundations in challenging soil conditions, ensuring stability and performance while addressing project-specific requirements.</p> Frank Lurich Andri Irfan Rifai Ade Jaya Saputra Copyright (c) 2024 Jurnal Teknik Sipil https://creativecommons.org/licenses/by-nc-sa/4.0 2024-10-31 2024-10-31 18 1 72 77 10.24002/jts.v18i1.10313