PENGARUH DAMPAK CONTRACT CHANGE ORDER TERHADAP KINERJA KONTRAKTOR PROYEK STUDI KASUS: REHABILITASI JEMBATAN NGABLAK

Authors

  • Agustina Dwi Kuswandari
  • A. Koesmargoro
  • Wulfram I. Ervianto

DOI:

https://doi.org/10.24002/jts.v14i4.2001

Keywords:

CCO (Contract Change Order), performance, kinerja

Abstract

Abstract: Factors that often happens when held CCO (Contract Change Order) Is the repeated coordination with owner related work to be done. The highest mean value of the variable is the performance indicator quantity is 3.87 and the lowest on indicators of punctuality that is equal to 3.71, these results indicate that Change orders on bridge rehabilitation work Ngablak caused by the inaccuracy of the time. CCO (Contract Change Order) affect the performance of contractors by 67.4%, so it can be concluded that done CCO (Contract Change Order) is then the contractor does experience a decrease in performance

 

Abstrak: Faktor yang sering terjadi ketika diadakan CCO (Contract Change Order) adalah terjadinya koordinasi yang berulang-ulang dengan owner terkait pekerjaan yang harus diselesaikan. Nilai mean tertinggi pada variabel kinerja adalah pada indikator kuantitas yaitu sebesar 3,87 dan yang terendah pada indikator ketepatan waktu yaitu sebesar 3,71, hasil tersebut menunjukkan bahwa Change order pada pekerjaan rehabilitasi Jembatan Ngablak disebabkan oleh ketidaktepatan waktu. CCO (Contract Change Order) berpengaruh terhadap kinerja kontraktor sebesar 67,4% sehingga dapat disimpulkan bahwa dilakukan CCO (Contract Change Order) ini maka kontraktor mengalami penurunan kinerja.

References

Abdullah, M. 2014,Manajemen dan Evaluasi Kinerja Karyawan, Aswaja Pressindo Yogyakarta

Abrar, Husen, 2011, Manajemen Proyek, Pen-erbit Andi, Yogyakarta

Barrie, Donald S, and Paulson, Boyd C Jr. (1992). Professional construction man-agement (3 rded). Third edition. Singa-pore: Mc Graw-Hill

Dharma, Surya, 2004, Manajemen Kinerja, Pustaka Pelajar, Yogyakarta

Dimyati, H.A. Hamdan & Nurjaman, Kadar, 2014, Manajemen Proyek, Bandung

Fisk, Edward R, and Reynolds Wayne D. (2006). Construction project administra-tion, eighth edition. New Jersey: Prentice Hall

Ghozali, Imam. 2011, Aplikasi Analisis Multi-variate Dengan Program SPSS, Semarang: Badan Penerbit Universitas Diponegoro

Gilberth, Robert D. (1992). Managing con-struction contract operational control for commercial risk, second edition. John Wiley & Sons.Inc

Gumolili, Sandy A., dan Sompie, B. F., dan Rantung, J.P. (2012), Analisa Faktor-Faktor Penyebab Change Order dan Pengaruhnya Terhadap Kinerja Waktu Pelaksanaan Proyek Konstruksi di Ling-kungan Pemerintah Provinsi Sulawesi Utara, Jurnal Ilmiah Media Engineering Vol. 2, No. 4, ISSN 2087-9334 (247-256)

Hanna, A. S., Camlic, R., Peterson, P. A., Nordheim, E. V. (2002), Quantitative Def-inition of projects Impacted by Change Orders, Journal of Construction Engineer-ing and Management. 128

Ilyas, Yaslis, 2005, Kinerja Teori, Penilaian dan Penelitian, Jakarta: Pusat Kajian Ekonomi Kesehatan Kesehatan Fakultas Kesehatan Masyarakat, Universitas Indo-nesia, Jakarta Fakultas Kesehatan Masyarakat, Universitas Indonesia,

Keputusan Presiden Nomor 80, 2003, Pedoman Pelaksanaan Pengadaan Barang/Jasa Pemerintah, Bappenas, Jakarta

Moeheriono. 2012, Pengukuran Kinerja Ber-basis Kompetensi, Raja Grafindo Persada Jakarta

Peraturan Presiden Nomor 54, 2010, Pengadaan Barang/Jasa Pemerintah, Bappenas, Jakarta

Schaufelberger, John E. and Holm, Len. (2002). Management of construction project con-structor’s perspective. New Jersey: Pren-tice Hall

Simamora, Henry. 2004, Manajemen Sumber Daya Manusia. Edisi Ke-3, STIE YKPN. Yogyakarta

Downloads

Published

2019-02-19

Issue

Section

Articles