The New Framework Maintenance Optimization Using Reliability Centered Maintenance-FMEA
DOI:
https://doi.org/10.24002/ijieem.v7i2.10798Keywords:
downtime, maintenance, optimization, reliability-centered maintenance (RCM)-FMEAAbstract
PT XYZ-Banten is the largest power generation company in Southeast Asia with a total output power of 3400 MW. The production process at PLTU XYZ is a continuous process. Of the 6 pumping machines that operate, if one of the machines or equipment is damaged or fails, the entire process will be stopped. Boiler Feed Pump (BFP) is the pump machine with the highest damage rate, with a percentage of 60% of all pumps located at PT XYZ-Banten. This research aims to optimize maintenance to increase reliability and minimize downtime on the BFP pump. The stages of the research with maintenance analysis using the Reliability Centered Maintenance (RCM)-FMEA method to identify the causes of failure, the impact caused, the category of damage, and the actions to be taken. The results with the Reliability Centered Maintenance (RCM)-FMEA method show that the most critical component is ARV with its task selection Condition Derect (CD) and the maintenance interval period for each component, including ARV 73 hours, Pipe 334 Hours, Mechanical Seal 960 hours, and Scooptube 1080 hours. Finally, the proposed improvements with 5W + 1H for more reliable and efficient maintenance optimization. Management implications are expected to help companies prevent machine failures and determine other factors that cause these failures.
References
Afefy, I.H., Mohib, A., El-kamash, A.M., & Mahmoud, M.A. (2019). A new framework of reliability-centered maintenance. Jordan Journal of Mechanical and Industrial Engineering, 13(3), 175–190.
Alvarez-Alvarado, M.S., Donaldson, D.L., Recalde, A., Noriega, H.H, Khan, Z.A., Velasquez, W., & Gallegos, C.D.R. (2022). Power System Reliability and Maintenance Evolution: A Critical Review and Future Perspectives. IEEE Access, 10, 51922–51950.
Chan, D., & Mo, J. (2017). Life Cycle Reliability and Maintenance Analyses of Wind Turbines. Energy Procedia, 110, 328–333.
Chaudhuri, A. Datta, R., Kumar, M.P., Davim, J.P., & Pramanik, S. (2022). Energy Conversion Strategies for Wind Energy System: Electrical, Mechanical and Material Aspects. Materials, 15(3), 1–34.
Dayo-Olupona, O., Genc, B., Celik, T., & Bada, S. (2023). Adoptable approaches to predictive maintenance in the mining industry: An overview. Resources Policy, 86(Part A), Article 104291.
de Jonge, B., & Scarf, P.A. (2020). A review on maintenance optimization. European Journal of Operational Research, 285(3), 805–824.
Analog Devices. (2004). CMOS 200 MSPS 14-Bit Quadrature Digital Upconverter (datasheet). Retrieved from: https://www.analog.com/media/en/technical-documentation/data-sheets/ad9857.pdf
Eriksen, S., Utne, I.B., & Lutzen, M. (2021). An RCM approach for assessing reliability challenges and maintenance needs of unmanned cargo ships. Reliability Engineering and System Safety, 210, Article 107550.
Fernandez, M.E., ten Hoor, G.A., van Lieshout, S., Rodriguez, S., Beidas, R.S., Parcel, G., Ruiter, R.A.C., Markham, C.M., & Kok, G. (2019). Implementation mapping: Using intervention mapping to develop implementation strategies. Frontiers in Public Health, 7, 1–15.
Filz, M.A. Langner, J.E.B., Herrmann, C., & Thielde, S. (2021). Data-driven failure mode and effect analysis (FMEA) to enhance maintenance planning. Computers in Industry, 129, Article 103451.
George, B., Loo, J.K., & Jie, W. (2022). Recent advances and future trends on maintenance strategies and optimisation solution techniques for the offshore sector. Ocean Engineering, 250, Article 110986.
Huang, J., You, J., Liu, H, & Song, M. (2020). Failure mode and effect analysis improvement: A systematic literature review and future research agenda. Reliability Engineering and System Safety, 199, Article 106885.
Ismail, N., & Setiafindari, W. (2023). Usulan Perbaikan Kualitas Pada Sarung Tangan Golf Lotus Menggunakan Metode Statistical Quality Control Dan 5W+1H. Jurnal Ilmiah Teknik Mesin, Elektro Dan Komputer, 3(2), 215–228.
Jia, C., Cai, Y., Yu, Y.T., & Tse, T.H. (2016). 5W+1H pattern: A perspective of systematic mapping studies and a case study on cloud software testing. Journal of Systems and Software, 116, 206–219.
Krisnaningsih, E., Sulistyo, A.B., Rahim, A., & Dwiyatno, S. (2022). Fuzzy risk priority number assessment to detect midsole product defects. Jurnal Sistem Dan Manajemen Industri, 6(1), 77–88.
Moleda, M., Momot, A., & Mrozek, D. (2020). Predictive maintenance of boiler feed water pumps using SCADA data. Sensors (Switzerland), 20(2), 1–19.
Musthopa, Harsanto, B., & Yunani, A. (2023). Electric power distribution maintenance model for industrial customers: Total productive maintenance (TPM), reliability-centered maintenance (RCM), and four-discipline execution (4DX) approach. Energy Reports, 10, 3186–3196.
Offshore, P., & Matuszak, Z. (2019). Reliability Centred Maintenance (RCM)-basics of implementation and general characteristics. Journal of Machine Construction and Maintenance, 4(107), 99–105.
Pramesti, V.D., & Susetyo, A.E. (2018). Analisis Penerapan Metode Reliability Centered Maintenance (RCM) Untuk Meningkatkan Keandalan Pada Sistem Maintenance. Industrial Engineering Journal of The University of Sarjanawiyata Tamansiswa, 2(1), 44–53.
Prasetya, H.E.G., Rahmania, W., & Sholihah, F.H. (2023). Maintenance Analysis of Boiler Feed Water Pump using Quantitative Methods. Presented at the 4th International Conference on Applied Science and Technology on Engineering Science (ICAST-ES 2021).
Rajput, P., Malvoni, M., Nallapaneni, M.K., Sastry, O.S., & Tiwari, G.N. (2019). Risk priority number for understanding the severity of photovoltaic failure modes and their impacts on performance degradation. Case Studies in Thermal Engineering, 16, Article 100563.
Ramere, M.D., & Laseinde, O.T. (2021). Optimization of condition-based maintenance strategy prediction for aging automotive industrial equipment using FMEA. Procedia Computer Science, 180, 229–238.
Rasindyo, M.R., Leksananto, K., & Helianty, Y. (2015). Analisis Kebijakan Perawatan Mesin Cincinnati Dengan Menggunakan Metode Reliability Centered Maintenance Di PT. Dirgantara Indonesia. Jurnal Online Institut Teknologi Nasional, 03(1), 400–410.
Sharifi, M., & Taghipour, S. (2021). Optimal production and maintenance scheduling for a degrading multi-failure modes single-machine production environment. Applied Soft Computing, 106, Article 107312.
Sharma, K.D., & Srivastava, S. (2018). Failure Mode and Effect Analysis (FMEA) Implementation: A Literature Review. Journal of Advanced Research in Aeronautics and Space Science J Adv Res Aero SpaceSci, 5(2), 2454–8669.
Shokri, A., & Fard, M.S. (2023). Principles, operational challenges, and perspectives in boiler feedwater treatment process. Environmental Advances, 13, Article 100389.
Sulistyo, Sinaga, N., Haryadi, G.D., & Wibowo, D.B. (2022). Reliability Analysis and Lifetime Prediction Using Weibull Method on Critical Components of Railway Braking System with Air Brake System. International Research Journal of Innovations in Engineering and Technology, 6(6), 51-58.
Kathiresan, P. (2021). Reliability Centered Maintenance Methodology To Manage Facilities (Master’s thesis, Pratt Institute).
Suryana, W. (2021). Analisis Pemeliharaan Mesin Produksi dengan Metode RCM (Reliability Centered Maintenace) Pada PT. Eluan Mahkota Kabupaten Rokan Hulu. Jurnal Teknik Industri, 1–48.
Tang, Y., Liu, Q., Jing, J., Yang, Y., & Zou, Z. (2017). A framework for identification of maintenance-significant items in reliability-centered maintenance. Energy, 118, 1295–1303.
Ullah, A., Ayat, M., Rehman, H.U., & Batala L.K. (2021). Optimal preventive maintenance level for a repairable product under warranty, subject to multimode failure process. International Journal of Quality and Reliability Management, 38(5), 1193–1214.
Wari, E., Zhu, W., & Lim, G. (2023). Maintenance in the downstream petroleum industry: A review on methodology and implementation. Computers and Chemical Engineering, 172, 1–53.
Yang, Y.J., Zhang, X., Zhao, Z., Wang, G., He, Y., & Wu, Y. (2020). Applying Reliability Centered Maintenance (RCM) to Sampling Subsystem in Continuous Emission Monitoring System. IEEE Access, 8, 55054–55062.
Yazdi, M., Mohammadpour, J., Li, H., Huang, H., Zareo, E., Pirbalouti, R.G., & Adumene, S. (2023). Fault tree analysis improvements: A bibliometric analysis and literature review. Quality and Reliability Engineering International, 39(5), 1639–1659.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2025 Erni Krisnaningsih, Gunawan Kristiyanto, Saleh Dwiyatno, Dadi Cahyadi

This work is licensed under a Creative Commons Attribution 4.0 International License.





